Project details

Project period
11.2016 – 04.2017
Location
Goczałkowice, Ul. Jeziorna 7

Preparation of a Functional and Utility Programme for the visualisation, control and supervisory system serving the process facilities at the Goczałkowice Water Treatment Plant.

The assignment comprised the preparation of a Functional and Utility Programme for process facilities located at the Goczałkowice Water Treatment Plant, covering the electrical and instrumentation and control disciplines (visualisation, control and supervisory system). The work was commissioned by Górnośląskie Przedsiębiorstwo Wodociągów Spółka Akcyjna, 19 Wojewódzka Street, 40-026 Katowice, under the contract entitled ‘Preparation of a Functional and Utility Programme for the visualisation, control and supervisory system serving the process facilities at the Goczałkowice Water Treatment Plant’.

The purpose of the assignment was to prepare a Functional and Utility Programme (hereinafter: PFU) for the electrical and instrumentation and control disciplines, defining the scope of works, technical and quality parameters, and functional characteristics that would form the principal guidelines for the design and execution of the construction project to modernise the visualisation, control and supervisory system serving the process facilities at the Goczałkowice Water Treatment Plant.

In accordance with the Client’s commission, the assignment covered:
1. Preparation of a Functional and Utility Programme (PFU) for the visualisation, control and supervisory system serving the process facilities at the Goczałkowice Water Treatment Plant,
2. Preparation of the Client’s cost estimate covering design-work costs and the planned construction costs specified in the Functional and Utility Programme.
1.6 Project location
The project will be implemented in Goczałkowice-Zdrój, a spa village in southern Poland; Śląskie Voivodeship, Pszczyna County, Municipality of Goczałkowice-Zdrój.

across the following facilities:

  • the Goczałkowice Water Treatment Plant at 5 Jeziorna Street, 42-320 Goczałkowice-Zdrój, including:
  • Ozone Production Building
  • Activated Carbon Filters I
  • Activated Carbon Filters II
  • Inter-facility Pumping Station
  • Stage II Pumping Station
  • GO-CZA I Rapid Filters
  • GO-CZA II Rapid Filters
  • Raw Water Pulsators
  • Reagent Systems
  • Sludge Thickening and Backwash Water Pulsators
  • Chlorination Building
  • the building known as ‘Mistrzówka’ — the plant’s Central Control Room
  • the building known as ‘Plant Manager’ — the plant manager’s office
  • the main water intake at Wypoczynkowa Street, 42-320 Goczałkowice-Zdrój, including:
  • Stage I Pumping Station — bank intakes Nos. 1, 2 and 3
  • MV switchgear and technical facilities building